Reform or Regression? A hard calculation at a hard moment

Bill McKibben
Oct 01, 2026
BAAJA would narrow that definition so that NEPA review would not be required for federal loans, certain grant programs, and repairs of essential infrastructure, among other actions. Geothermal testing, Federal Energy Regulatory Commission permits for transmission projects, and gas pipeline projects within existing rights-of-way would also be excluded.
And
BAAJA would also codify several regulatory changes to Section 401 of the Clean Water Act that Trump’s EPA proposed earlier this year to limit state power. Under current law, a federal agency cannot issue a permit to a project that will discharge pollution into a body of water unless the relevant state or tribe issues a water quality certification or waives that right. The permitting bill would give states and Tribes a maximum of one year to review a project or otherwise waive their right to certify. Senators also proposed that if the state or Tribe waives certification, the matter is settled — the federal government cannot then conduct its own water quality review. If the state or Tribe decide to attach conditions to a certification, or to deny the project altogether, the bill would place a much higher burden of proof on them to back up their decision. States would only be allowed to reject a project based on water quality — they could not cite air pollution or climate impacts.



Comments